WELCOME TO THE WORLD OF

Leading System Integrator for railway engineering

WELCOME TO WORLD OF e2E RAIL

Leading System Integrator for railway engineering

e2E Rail is an ISO 9001:2015 certified organization providing rail engineering expertise to rail infrastructure projects for mainline and mass transit systems in India and abroad.

We design and build high-quality customized solutions for track, signaling, communication systems and electrification projects in India & abroad.

OUR CAPABILITIES

Signaling & Telecommunication

  • SSI based Electronic Interlocking
  • Computer-based Interlocking
  • ETCS Level 2
  • CBTC systems
  • Route Relay Interlocking
  • Panel Interlocking

Overhead Electrification

  • 25 KV AC OHE
  • 33 KV/66 KV HT
  • Traction Substation (TSS)
  • Switching Station (SP/SSP)
  • Third Rail 750V DC
  • Power Supply Systems

Permanent Way / Track

  • Track Laying & Linking
  • Formation
  • Track Re-laying
  • Track maintenance
  • Ballast & Ballast-less Track
  • Standard Gauge & Broad Gauge

The depth of our industry understanding means that we always design and deliver timely, high-quality and cost-effective results, whether we’re working on-site, off-shore or near-shore.

Key Stats
No Of Clients
65

Team

300+

Project value delivered

2450 Million

Network Maintained

2050+ km
Testimonials

“We have handed over Hyderabad Stage 1 to Keolis successfully on March 31, 2015. This was a significant achievement for Thales. This is our first CBTC and interlocking product deployment in India. We also made a record on deployment duration. We deployed both systems within 19 months. You and your team played a significant role on this journey and without your support we wouldn’t have achieved this significant milestone. My sincere thanks to you and your team for all the support provided towards this successful journey.
I am looking forward to continue our partnership towards many other new challenges to come.”

The project constitutes maintenance of 275 point machines, 111 shunt signals, 31 main signals and 273 track circuits in addition to the SSI/RRI signaling systems.
The company has deployed trained and competent manpower to take care of 24X7 maintenance of the Solid State Interlocking & Route Relay Interlocking Signaling Systems and their performance is very good. “

“We thank e2E Rail for obtaining track fit certificate for ACC Bargarh Cement Works siding from ECoR“

I am pleased to inform that the e2E Rail team is providing an outstanding performance in supporting O’Donnell Griffin Rail throughout its delivery of the design for the BHP Biliton Port Headland Inner Harbor Project and Jimblebar Project (PHIHP/JP) and of the Fortescue Metal Group (FMG) Mainline Duplication project.
I want to thank the e2E Rail design & management team for their continued support.”

Get in touch with us to expierence e2E Rail